Blue Spec Project

The Blue Spec Project (Blue Spec or the Project) is located 20km south-east of AIM Mining Corporation’s (AIM) 100% owned Nullagine Gold Project and 70km from AIM’s 100% owned Warrawoona Gold Project. The Project is accessible by roads to the Nullagine Gold Project and the Warrawoona Gold Project.

The Blue Spec mine was historically mined to 320m vertical depth with existing decline and shaft infrastructure. Surface infrastructure includes offices and workshops, extensive roads, and a historical processing facility and tailings dam.

Given its close proximity, Blue Spec has significant potential to provide a strategic high-grade satellite feed to Nullagine’s Golden Eagle Plant, enhancing the production profile and extending mine life at a relatively low capital intensity. The Project also provides AIM with potential for increased flexibility around mine scheduling at Nullagine Project.

Blue Spec History

The Blue Spec deposit was discovered in 1906. Early mining to a depth of 180m vertical was undertaken by following the vein system one level at a time. Stope developments were poorly designed for the style of orebody and drives often ended in ore grade material. The historical ore grade cut-off in the upper levels was also higher at 22 to 28g/t Au and as a result, only a small proportion of upper level ore was mined.

Anglo American (Anglo) acquired the Blue Spec mine in 1974 and defined an ore reserve from the 180m to 320m vertical level. Anglo sunk a new triple compartment shaft to the 180m level and developed decline access to the ore reserve. Anglo utilised mechanised cut and fill mining methods with average stope widths of approximately 2m. Stoping of the orebody to widths of less than 1.8m in the western extent of the Blue Spec orebody during the last three periods of production achieved lower dilution rates with production exceeding 36g/t gold and 3.5% antimony.

Anglo closed the mine in 1979 once the original ore reserve blocks had been extracted.

Historically, the Blue Spec mine has averaged production in excess of 25g/t gold with over 60,000oz of gold and 1,500 tonnes of antimony produced from the mine.

Gold Spec Mine History

The Gold Spec mine is located on the Blue Spec Shear, approximately 1km west of the Blue Spec mine. The mine was first opened and put into production by Invincible Mining NL in the mid-1980s. The mine produced approximately 20,000oz Au at an average head grade of 12g/t gold. The most recent mining of the main shoot and western shoot was undertaken in 1993 to a depth of 120m.

Northwest Resources (NWR) acquired both deposits and advanced exploration and developed scoping level studies incorporating refurbishment and installation of new site infrastructure, re-establishment of the existing shaft and decline access to the ore body. The project was subsequently sold to Novo Resources Corp, which performed limited exploration drilling in 2016.

Geology

Mineralisation at the Blue Spec deposit is hosted in quartz veins that average 1.5m to 3m in width but which are known to blow out to over 8m in certain zones. High-grade gold mineralisation is variously associated with the presence of massive stibnite (the sulphide form of the metal antimony).

Where defined, the strike length of the Blue Spec orebody has varied from 120m to 160m. In the upper levels of development, the orebody exhibited a near vertical plunge. At the 450m vertical metre level, the dip of the orebody deviates from near vertical to steeply north dipping.

The Blue Spec orebody is characterised by a well-defined vein morphology, hosted within a localised structural setting along the Blue Spec Shear. The remarkable plunge continuity over its known depth extent is related to key connection points within the fault network that hosts the deposit. These same connection points have dictated the location of Blue Spec’s main high-grade shoot locations from surface to the bottom level of development as evidenced in detailed underground mapping.

Gold mineralisation is of orogenic lode vein style and is hosted by an east-west trending shear zone. Multiple gold-bearing quartz veins occupying steeply plunging shoots occur along this shear zone, which are accompanied by significant amounts of stibnite.

Both the Blue Spec and Gold Spec deposits are open along down dip and associated splay zones have never been fully tested. Historic drillholes at Blue Spec including BSP0264 (18.0m @ 4.21g/t), BSP0177 (11.0m @ 7.53g/t) and 16BSDH016 (3.0m @ 5.01g/t) are located outside the current mineral resource model and suggest immediate potential to expand this deposit through further drilling.

Mineral Resource

The Project consists of two high grade shoots, the Blue Spec and Gold Spec deposits, and hosts a global JORC 2012 Mineral Resource of 190,000oz Au at 24.4g/t Au. Both deposits are open down dip and have along strike repeat potential providing exploration upside to known high grade mineral resources.

Blue Spec Project Mineral Resource (Oct 2022)

Deposit  Measured  Indicated  Inferred  Total 
kt  Au (g/t)  koz  kt  Au (g/t)  koz  kt  Au (g/t)  koz  kt  Au (g/t)  koz 
Blue Spec  70  31.5  71  96  21.2  66  166  25.5  136 
Gold Spec  24  30.1  24  52  17.9  30  76  21.8  54 
Total  0  0.0  0  94  31.1  95  148  20.1  96  243  24.4  190 

Blue Spec Project Mineral Resource (AuEq) (as at Oct 2022)

Blue Spec Project  Indicated  Inferred  Total 
Kt  Au (g/t)  Sb (%)  AuEq (g/t)  AuEq koz  Kt  Au (g/t)  Sb (%)  AuEq (g/t)  AuEq koz  Kt  Au (g/t)  Sb (%)  AuEq (g/t)  AuEq koz 
Blue Spec  70  31.5  1.5  35.3  79  96  21.2  1.6  25.3  78  166  25.5  1.6  29.6  158 
Gold Spec  24  30.1  2.6  36.7  28  52  17.9  1.3  21.2  35  76  21.8  1.7  26.1  64 
Total  94  31.1  1.8  35.7  108  148  20.1  1.5  23.8  114  242  24.3  1.6  28.4  222 

Ore Reserve

In October 2022, the previous owner of the Company announced a maiden Ore Reserve for the Blue Spec Project. The Ore Reserve was were calculated on a cut-off using Net Smelter Return and Gold Equivalent using metal pricing, recoveries and other payability assumptions detailed in Section 4 in the JORC Code Table 1 and ASX Listing Rules 5.9.1 (Section 13).

Deposit kt Proved Au (g/t) koz kt Probable Au (g/t) koz kt Total Au (g/t) koz
Blue Spec – – – 230 11.2 83 230 11.2 83

Feasibility Study

Blue Spec is a steeply dipping vertical/sub-vertical narrow vein deposit. There are two separate mining areas located ~1.2 km apart along strike, named Blue Spec and Gold Spec. Detailed analysis by independent geotechnical experts Peter O’Bryan & Associates was carried out to Feasibility study standard and this provided the key justification for the chosen mining method.

Based on these inputs, the mining method selected was overhand mechanised cut-and-fill with four x 4mH lifts in each panel (total panel height 16m). Three lifts will be extracted using jumbo development techniques with the top lift finally back-stripped on retreat. Cemented rockfill (CRF) will be placed in the bottom lift to allow stoping underneath, with uncemented rockfill used elsewhere. Single-boom jumbo drills will be used for the ore development and low-profile loaders for production material movement.

Access to the mine is planned to be through a boxcut and portal arrangement, via a 5.0 mW x 5.0 mH decline. Capital development will be mined using twin-boom jumbos and 5 m3 loaders, which will also load all material onto trucks.

A schematic of the proposed mining plan is shown in the figure below.

Processing

Extensive metallurgical test work completed on the Project by previous owners demonstrated the effectiveness of using flotation for the recovery of gold and antimony. Results suggested that an overall gold recovery of 95% is achievable.  The test work also showed that additional gold could be recovered by cyanide leaching of the flotation tailings. AIM Mining Corporation is conducting a verification test of the previous studies and planning to optimise the processing solution by utilising existing facilities.